Laserfiche WebLink
Downstream drainage leading from the site to a receiving body of water: <br /> Snohomish River/Possession Sound. <br /> Critical areas that receive runoff from the site up to one-quarter mile away: <br /> None within one-quarter mile. <br /> Special requirements and provisions for working near or within critical areas: <br /> No critical areas in the development area. <br /> Areas on the site that have potential erosion problems: <br /> All existing slopes are maintained by erosion control grasses. Any exposed soils will be <br /> amended with BMP T5.13. <br /> Locations where surface water leaves the site: <br /> Sheetflow through erosion control grasses to the west, east and south. <br /> 0 Task 2: Select Construction Best Management Practices (BMPs) to be used on your <br /> project. <br /> Each of the 13 requirements below contains a list of Best Management Practices <br /> (BMPs) that are accepted by the Washington State Department of Ecology for <br /> satisfying each requirement. The BMPs below are the most common. For a complete <br /> selection of BMPs please see Volume II of Ecology's Stormwater Management Manual <br /> for Western Washington, current edition. <br /> Each of the 13 Elements below must be considered in the SWPPP. Select all BMPs <br /> that you will be using to satisfy each requirement. All requirements must have at least <br /> one item selected. <br /> Element 1. Preserve vegetation/mark clearing limits: <br /> 0 BMP C101: Preserving Natural Vegetation <br /> ❑ BMP C102: Buffer Zones <br /> Minimum Requirement #1-9 Project Forms City of Everett <br /> Construction Stormwater Pollution Prevention Plan (SWPPP) 12 Aug 2022 <br />