My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2801 35TH AVE NE 2025-04-07
>
Address Records
>
35TH AVE NE
>
2801
>
2801 35TH AVE NE 2025-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:43:47 PM
Creation date
3/31/2025 10:04:09 AM
Metadata
Fields
Template:
Address Document
Street Name
35TH AVE NE
Street Number
2801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element 8. Stabilize Channels and Outlets: <br /> ❑ BMP C202: Channel Lining <br /> ❑ BMP C209: Outlet Protection <br /> ❑ Other Per the SWMMWW: <br /> ------------------------- <br /> 71 Not applicable to my proposed project <br /> Explain: No channels areproposed--------------------------- <br /> Element 9. Control pollutants: <br /> KI BMP C151: Concrete Handling <br /> KI BMP C152: Sawcutting and Surfacing Pollution Prevention <br /> 0 BMP C153: Material Delivery, Storage, and Containment <br /> ❑ BMP C154: Concrete Washout Area <br /> ❑ BMP C250: Concrete Stormwater Chemical Treatment <br /> ❑ BMP C251: Construction Stormwater Filtration <br /> ❑ BMP C252: High pH Neutralization Using CO2 <br /> ❑ BMP C253: pH Control for High pH Water <br /> ❑ Other Per the SWMMWW: <br /> ------------------------- <br /> ❑ Not applicable to my proposed project <br /> Explain: ------------------------------------------------- <br /> Element 10. Control dewatering: <br /> ❑ BMP C236: Vegetative Filtration <br /> ❑ Other Per the SWMMWW: <br /> ------------------------- <br /> 71 Not applicable to my proposed project <br /> Explain: Dewatering is not expected based on the geotech report.— <br /> Element 11. Maintain BMPs: <br /> 71 BMP C150: Materials On Hand <br /> p7i BMP C160: Certified Erosion and Sediment Control Lead (CESCL not <br /> required on-site for <1 acre) <br /> ❑ Other Per the SWMMWW: <br /> ------------------------- <br /> ❑ Not applicable to my proposed project <br /> Explain: ------------------------------------------------- <br /> Minimum Requirement #1-9 Project Forms City of Everett <br /> Construction Stormwater Pollution Prevention Plan (SWPPP) 15 Aug 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.