Laserfiche WebLink
Element 8. Stabilize Channels and Outlets: <br /> ❑ BMP C202: Channel Lining <br /> ❑ BMP C209: Outlet Protection <br /> ❑ Other Per the SWMMWW: <br /> ------------------------- <br /> 71 Not applicable to my proposed project <br /> Explain: No channels areproposed--------------------------- <br /> Element 9. Control pollutants: <br /> KI BMP C151: Concrete Handling <br /> KI BMP C152: Sawcutting and Surfacing Pollution Prevention <br /> 0 BMP C153: Material Delivery, Storage, and Containment <br /> ❑ BMP C154: Concrete Washout Area <br /> ❑ BMP C250: Concrete Stormwater Chemical Treatment <br /> ❑ BMP C251: Construction Stormwater Filtration <br /> ❑ BMP C252: High pH Neutralization Using CO2 <br /> ❑ BMP C253: pH Control for High pH Water <br /> ❑ Other Per the SWMMWW: <br /> ------------------------- <br /> ❑ Not applicable to my proposed project <br /> Explain: ------------------------------------------------- <br /> Element 10. Control dewatering: <br /> ❑ BMP C236: Vegetative Filtration <br /> ❑ Other Per the SWMMWW: <br /> ------------------------- <br /> 71 Not applicable to my proposed project <br /> Explain: Dewatering is not expected based on the geotech report.— <br /> Element 11. Maintain BMPs: <br /> 71 BMP C150: Materials On Hand <br /> p7i BMP C160: Certified Erosion and Sediment Control Lead (CESCL not <br /> required on-site for <1 acre) <br /> ❑ Other Per the SWMMWW: <br /> ------------------------- <br /> ❑ Not applicable to my proposed project <br /> Explain: ------------------------------------------------- <br /> Minimum Requirement #1-9 Project Forms City of Everett <br /> Construction Stormwater Pollution Prevention Plan (SWPPP) 15 Aug 2022 <br />