My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2801 35TH AVE NE 2025-04-07
>
Address Records
>
35TH AVE NE
>
2801
>
2801 35TH AVE NE 2025-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:43:47 PM
Creation date
3/31/2025 10:04:09 AM
Metadata
Fields
Template:
Address Document
Street Name
35TH AVE NE
Street Number
2801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element 12. Manage the Project: <br /> 71 BMP C150: Materials On Hand <br /> p7i BMP C160: Certified Erosion and Sediment Control Lead (CESCL not <br /> required on-site for <1 acre) <br /> 71 BMP C162: Scheduling <br /> ❑ Other Per the SWMMWW: <br /> ------------------------- <br /> ❑ Not applicable to my proposed project <br /> Explain: ------------------------------------------------- <br /> Element 13. Protect low impact development: <br /> ❑ BMP C102: Buffer Zones <br /> ❑ BMP C103: High Visibility Plastic or Metal Fence <br /> ❑ BMP C200: Interceptor Dike and Swale <br /> ❑ BMP C207: Check Dams <br /> ❑ BMP C208: Triangular Silt Dike (Geotextile Encased Check Dam) <br /> ❑ BMP C231: Brush Barrier <br /> ❑ BMP C233: Silt Fence <br /> ❑ BMP C234: Vegetated Filter Strip <br /> ❑ Other Per the SWMMWW: <br /> ------------------------- <br /> 71 Not applicable to my proposed project <br /> Explain: <br /> Amended soils will be placed last and will be protected with mulch and seeding per Element 5. <br /> ------------------------------------------------- <br /> *Note: Include BMPs to protect BMP T5.13 soils. <br /> Task 3: Construction SWPPP Drawings <br /> Provide a Temporary Erosion and Sediment Control (TESC) plan for your project. <br /> I] Show all BMPs selected above to satisfy the 13 Elements on your TESC <br /> Plan. <br /> I] See City of Everett Public Works Standard Plan 103 -TESC Plan Example <br /> https://www.everettwa.gov/DocumentCenter/View/7040 <br /> Minimum Requirement #1-9 Project Forms City of Everett <br /> Construction Stormwater Pollution Prevention Plan (SWPPP) 16 Aug 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.