Laserfiche WebLink
Element 3: Control Flow Rates (2.1.3) <br /> Will you construct stormwater retention and/or detention facilities? <br /> NO <br /> Will you use permanent infiltration ponds or other low impact development (example: rain <br /> gardens, bio-retention, porous pavement) to control flow during construction? <br /> NO. <br /> List and describe BMPs: <br /> NONE: Flows to flow control exempt water body. <br /> Installation Schedules:N/A <br /> Inspection and Maintenance plan: N/A <br /> Responsible Staff: CESCL and contractor. <br />