Laserfiche WebLink
Element 6: Protect Slopes (2.1.6) <br /> Will steep slopes be present at the site during construction? <br /> NO On-site slopes are generally 1-4 percent. Constructed slopes will generally be a <br /> maximum of 3:1 and protected with soil stabilization BMPs. Any 2:1 slopes will be trackwalked <br /> prior to stabilization. <br /> List and describe BMPs: <br /> BMP C130: Surface Roughening: Slopes steeper than 3:1 will be trackwalked to provide for <br /> compaction and surface roughness prior to stabilization. <br /> See Element 5 <br /> Installation Schedules: During grading operations. <br /> Inspection and Maintenance plan: Inspect slopes and provide for additional measures as <br /> warranted. <br /> Responsible Staff: CESCL and Contractor <br />