My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2801 35TH AVE NE 2025-04-07
>
Address Records
>
35TH AVE NE
>
2801
>
2801 35TH AVE NE 2025-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:43:47 PM
Creation date
3/31/2025 10:04:09 AM
Metadata
Fields
Template:
Address Document
Street Name
35TH AVE NE
Street Number
2801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Other: <br /> Other BMPs will be administered as necessary to address any additional pollutant sources on <br /> site. <br /> Installation Schedules: These BMPs are to be implemented at the time of need throughout the <br /> project. <br /> Inspection and Maintenance plan: Verify that the BMP is functioning and take corrective <br /> measures as required. <br /> Responsible Staff: CESCL and contractor <br /> Will maintenance, fueling, and/or repair of heavy equipment and vehicles occur on-site? <br /> Yes Fueling will be by off-site vehicle, no storage of fuel on-site. Maintenance will only <br /> be in case of a breakdown of equipment and will be limited. Large issues will <br /> require the piece of equipment be removed from the site. <br /> All vehicles, equipment, and petroleum product storage/dispensing areas will be inspected <br /> regularly to detect any leaks or spills, and to identify maintenance needs to prevent leaks <br /> or spills. <br /> • On-site fueling tanks and petroleum product storage containers shall include secondary <br /> containment. <br /> • Spill prevention measures, such as drip pans, will be used when conducting maintenance <br /> and repair of vehicles or equipment. <br /> • In order to perform emergency repairs on site, temporary plastic will be placed beneath <br /> and, if raining, over the vehicle. <br /> • Contaminated surfaces shall be cleaned immediately following any discharge or spill <br /> incident. <br /> Will wheel wash or tire bath system BMPs be used during construction? <br /> No <br /> Will pH-modifying sources be present on-site? <br /> Yes Cement treated base will be used to strengthen the sub-soils. <br /> Table 3— pH-Modifying Sources <br /> None <br /> Bulk cement <br /> Cement kiln dust <br /> Fly ash <br /> X Other cementitious materials -Cement Treated Base <br /> New concrete washing or curing waters <br />
The URL can be used to link to this page
Your browser does not support the video tag.