My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9506 7TH AVE SE 2025-04-08
>
Address Records
>
7TH AVE SE
>
9506
>
9506 7TH AVE SE 2025-04-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 7:33:50 AM
Creation date
3/31/2025 1:29:27 PM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9506
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Potential Activities/Cause of Proposed Measures to Minimize <br /> Disturbance Disturbance Ak Impacts <br /> • Covenants will be established to limit the <br /> Chemicals • Pesticides use of pesticides within 150 feet of the <br /> • Pest management wetland. <br /> • Integrated pest management will be <br /> applied. <br /> • The on-site stormwater system will provide <br /> Retrofit • Roads treatment of runoff in a manner consistent <br /> Stormwater • Existing with stormwater treatment standards and <br /> Detention and development that will meet city and state water quality <br /> Treatment standards. <br /> • The proposed grades will ensure that <br /> Channelized • Lawns adjacent to channelized flow from lawns adjacent to <br /> Flow buffer the buffer will not occur. <br /> • Runoff will be collected, treated, and <br /> Disperse • Impervious dispersed on the east and west sides of the <br /> Runoff surfaces wetland buffer. <br /> • Lawns <br /> • Privacy fencing will be provided around the <br /> Wetland • Future residents lots adjacent to the wetland. <br /> Protection • Pets • The buffer will be enhanced with dense <br /> native trees and shrubs appropriate for the <br /> ecoregion. <br /> • The wetland and buffer will be placed in a <br /> separate tract. <br /> • Signage and fencing will be provided <br /> around the wetland to discourage intrusion. <br /> • Dust will be controlled with best <br /> Dust • Construction sites management practices, as described in <br /> the Stormwater Pollution Prevention <br /> Plan. <br /> 3.3 PRIORITY HABITAT CORRIDOR <br /> Pursuant to EMC 19.37.110(A), a relatively undisturbed vegetated corridor at least one hundred <br /> feet wide must be protected between the wetland and any nearby priority habitat, when feasible. <br /> The only other priority habitats near the site are the off-site portions of Wetland A/Stream A to <br /> the north, which are already connected to the on-site critical areas. No other priority habitats <br /> occur nearby that could be connected with a corridor. A corridor is not required when there are <br /> no other priority habitats nearby. <br /> Chelsea Heights 11 Critical Area Study &Buffer Enhancement Plan <br /> WRI#22101 October 10, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.