Laserfiche WebLink
Table 3 — General Mitigation Measures <br /> Potential Activities/Cause of Proposed Measures to Minimize <br /> Disturbance Disturbance Impacts <br /> • Wetland A is located north of the <br /> Lights • Roads east/west access road, so lights from <br /> • Residences vehicles will not be directed into the <br /> wetland. <br /> • The existing buffer is well vegetated, so <br /> lights are already blocked from the <br /> wetland. Buffer enhancement will further <br /> block light from reaching the wetland. <br /> • The proposed development will have four <br /> residences adjacent to the buffer. <br /> Residential yard lights will be manually <br /> controlled and used for short durations. <br /> Solid privacy fencing around the lots will <br /> minimize the amount of light reaching the <br /> wetland. <br /> • Noise from construction activities will be <br /> Noise • Construction temporary, during daylight hours. <br /> • Residences Machinery will be turned off when not <br /> • Vehicles actively in use. <br /> • Noise from the residences will be limited to <br /> residents and vehicle traffic, which will be <br /> lower than the ambient noise from 7th <br /> Avenue SE and the adjacent commercial <br /> developments. <br /> • During the clearing and grading activities, <br /> Untreated • Construction runoff will be collected and directed to a <br /> Runoff equipment temporary stormwater pond. <br /> • Roads • Erosion and sedimentation control <br /> measures will be in place while clearing, <br /> grading, and construction occurs. <br /> • Construction equipment will be kept <br /> outside of the wetland and its buffer. <br /> • All runoff from the proposed development <br /> will be collected and treated in a manner <br /> consistent with stormwater treatment <br /> standards and that will meet city and state <br /> water quality standards. <br /> • Hydrology in the wetland is provided by <br /> the stream. No changes to the stream are <br /> proposed, so the wetland will not be <br /> dewatered. <br /> Chelsea Heights 10 Critical Area Study &Buffer Enhancement Plan <br /> WRI#22101 October 10, 2022 <br />