Laserfiche WebLink
The comments below were generated from this project's City of Everett Industrial Pretreatment Reviewer. All questions shall be routed through this project's <br />Public Works Reviewer Thad Newport with City of Everett Permit Services (TNewport@everettwa.gov). <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />City Comment: While the designer states that the pipe in <br />connection point to the separated storm for <br />question does not warrant further investigation, since it has <br />the canopy structure. Design for canopy <br />been indicated that it is "likely a roof drain connection to the <br />roof drainage piping is outside the scope <br />canopy", the source must be confirmed. If the source is from the <br />required for site development permits. <br />roof of the canopy, the flow from the roof of the canopy (this <br />Nelson is willing to redirect the canopy <br />pipe) must be directed to the stormwater system, not to the <br />drains to the storm as a voluntary gesture to <br />sanitary sewer. Per EMC 14.40.050.13.12, roof runoff and <br />resolve the City's concerns. The change is <br />stormwater are prohibited discharges stormwater to the sanitary <br />not required by Code. <br />sewer. <br />If the pipe's source is found to be something other than the roof <br />drain of the canopy, the designer must indicate the source <br />before any approval of connection of this source is allowed to <br />the sanitary sewer. <br />Page 7 of 7 <br />