Laserfiche WebLink
The comments below were generated from this project's City of Everett Stormwater Reviewers. All questions shall be routed through this project's Public Works <br />Reviewer Thad Newport with City of Everett Permit Services (TNewport@everettwa.gov). <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />Review Comments from DEPARTMENT NAME: _Surface Water Management ,REVIEWER NAME: _Cindy Cullen <br />1 <br />Informational <br />- <br />The Designer's Response to Comments indicated that the oil stop <br />Acknowledged. The oil stop valve isolates <br />Comment <br />valve and manual shutoff valve will no longer be part of the <br />the onsite collection system from the <br />storm conveyance system. An oil stop valve or similar spill <br />downstream storm. The revised drainage <br />response device may be needed under the site's industrial <br />design completely separates the fueling <br />stormwater permit. Confirm with Ecology. <br />drainage from the downstream storm <br />network. The isolation valve is no longer <br />required to protect the downstream storm <br />system and can be removed. <br />2 <br />Informational <br />- <br />It should be noted that compliance and approvals by the City of <br />Acknowledged. <br />Comment <br />Everett do not constitute compliance with the Washington State <br />Department of Ecology Industrial Stormwater Permit. It is the <br />applicant's responsibility to ensure compliance with <br />requirements of the Industrial Stormwater Permit and other <br />applicable regulations. <br />Page 8 of 8 <br />