Laserfiche WebLink
APPENDIX A <br />Interim Discharge Prevention Plan Daily Inspection Report <br />Inspections must be conducted by a person with the knowledge and skills to assess conditions and activities that could impact <br />stormwater quality at the facility, and evaluate the effectiveness of best management practices required by this permit. Retain <br />a copy of the completed and signed form in accordance with Permit Condition S9.C. <br />FACILITY NAME: Nelson Petroleum, Inc. <br />INSPECTION TIME: DATE: <br />WEATHER INFORMATION: <br />• Description of Weather Conditions (e.g., sunny, cloudy, raining, snowing, etc.): <br />• Was stormwater (e.g., runoff from rain or snowmelt) flowing at outfalls and/or discharge areas shown on the Site Map <br />during the inspection: ❑ Yes ❑ No ❑ Comments: <br />I. POTENTIAL POLLUTANT SOURCE AREA INSPECTION AND BEST MANAGEMENT PRACTICES EVALUATION <br />SWPPP and Site Map: Have a copy of the SWPPP and site map <br />Yes <br />No <br />Findings and Remedial Action Documentation: <br />with you during the inspection so that you can ensure they are <br />Describe any findings below and the schedule for <br />current and accurate. Use it as an aide in recording the location of <br />remedial action completion including the date <br />any issues you identify during the inspection. <br />initiated and date completed or expected to be <br />• Is the Site Map current and accurate? <br />completed. <br />• Is the SWPPP inventory of activities, materials and products <br />current? <br />Any new potential pollutant sources must be added to the map and <br />reflected in the SWPPP Facility Assessment & Tables 2, 2A, 3 an <br />5. <br />