My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9826 7TH AVE SE 2025-06-25
>
Address Records
>
7TH AVE SE
>
9826
>
9826 7TH AVE SE 2025-06-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2025 11:13:52 AM
Creation date
4/1/2025 1:59:20 PM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9826
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX A <br />Interim Discharge Prevention Plan Daily Inspection Report <br />Inspections must be conducted by a person with the knowledge and skills to assess conditions and activities that could impact <br />stormwater quality at the facility, and evaluate the effectiveness of best management practices required by this permit. Retain <br />a copy of the completed and signed form in accordance with Permit Condition S9.C. <br />FACILITY NAME: Nelson Petroleum, Inc. <br />INSPECTION TIME: DATE: <br />WEATHER INFORMATION: <br />• Description of Weather Conditions (e.g., sunny, cloudy, raining, snowing, etc.): <br />• Was stormwater (e.g., runoff from rain or snowmelt) flowing at outfalls and/or discharge areas shown on the Site Map <br />during the inspection: ❑ Yes ❑ No ❑ Comments: <br />I. POTENTIAL POLLUTANT SOURCE AREA INSPECTION AND BEST MANAGEMENT PRACTICES EVALUATION <br />SWPPP and Site Map: Have a copy of the SWPPP and site map <br />Yes <br />No <br />Findings and Remedial Action Documentation: <br />with you during the inspection so that you can ensure they are <br />Describe any findings below and the schedule for <br />current and accurate. Use it as an aide in recording the location of <br />remedial action completion including the date <br />any issues you identify during the inspection. <br />initiated and date completed or expected to be <br />• Is the Site Map current and accurate? <br />completed. <br />• Is the SWPPP inventory of activities, materials and products <br />current? <br />Any new potential pollutant sources must be added to the map and <br />reflected in the SWPPP Facility Assessment & Tables 2, 2A, 3 an <br />5. <br />
The URL can be used to link to this page
Your browser does not support the video tag.