My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Spectrum Psychological Associates 3/31/2025
>
Contracts
>
6 Years Then Destroy
>
2026
>
Spectrum Psychological Associates 3/31/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 9:05:38 AM
Creation date
4/1/2025 2:07:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Spectrum Psychological Associates
Approval Date
3/31/2025
End Date
3/15/2026
Department
Finance
Department Project Manager
Jenny Chang
Subject / Project Title
Mental Health Services
Tracking Number
0004749
Total Compensation
$52,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Spectrum Psychological Associates 3/7/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 8 of 53 <br />SECTION 3 – PROPOSAL EVALUATION PROCESS <br />3. 1 GENERAL <br />All proposals will be reviewed to determine compliance with the requirements specified in the RFP. <br />Proposals will be evaluated on how well they meet the city's needs, as described in the supplier’s <br />response to each requirement and the evaluation criteria identified in this RFP. It is important that the <br />responses be clear and complete so that the evaluators can adequately understand all aspects of the <br />proposal. <br />3.2 SELECTION PROCESS <br />The City will select the proposal that, in its sole discretion, is the most advantageous to the City. The City <br />reserves the right to make an award without further discussion of the proposal submitted; there may not <br />be best and final offer procedure. Therefore, the proposal should be initially submitted on the most <br />favorable terms that the supplier can offer. The specifications may be altered by the City of Everett based <br />on the supplier’s proposal, and an increase or reduction of services with the supplier may be negotiated <br />before contract signing, award, and execution. <br />3.3 CONTRACT AWARD AND EXECUTION <br />A contract award will be for the supplier that best meets the needs of the City of Everett. <br />The award of a contract to the successful supplier will be the notice of acceptance. The award of a <br />contract will bind the supplier to furnish the service in accordance with the information herein, responses <br />to questions, the supplier’s proposal, other representations made, as well as all other terms and <br />conditions of the contract in its final form. <br />3.4 EVALUATION CRITERIA <br />Proposals will be evaluated based on the following weighted criteria and how well they meet the needs <br />and requirements as described in the RFP. <br />Minimum Qualifications: The City of Everett will first examine proposals to eliminate those that do not <br />meet the following minimum qualifications. <br /># Criteria Points Description <br /> Eligibility Pass/Fail Certification in Washington State as a psychologist. <br />1 Qualifications and Relevant Experience 100 Evaluate responses to Questionnaire 4.03. <br />2 Technical Capability, Approach, and <br />Capacity <br />100 Evaluate responses to Questionnaire 4.03. <br />3 Communication, Customer Services, and <br />Training <br />65 Evaluate responses to Questionnaire 4.03. <br />4 Risk, Performance, and Quality Assurance 35 Evaluate responses to Questionnaire 4.03. <br />5 Price Proposal <br /> <br />100 Evaluate Suppliers’ price proposals to determine if <br />the cost is fair and reasonable. Proposed prices: <br />• are realistic for the work to be performed and <br />• demonstrate that the Supplier understands the <br />Scope of Work. <br /> Total 400 <br />Exhibit C
The URL can be used to link to this page
Your browser does not support the video tag.