Laserfiche WebLink
2022-08-04 <br /> FAC Systems INC. (Responses in PURPLE) <br /> Responses make reference to structural calculations (dated 2022-07-26) and drawings <br /> (dated 2022-08-04) pepared by FAC Systems INC. <br /> 1 CiTY OF EWERETT <br /> EVERETT Permit Services <br /> .3,4 <br /> AUG 1 6 2022 -1 <br /> eilY Ut- hVtKEI I <br /> March 11, 2022 Permit Services <br /> Mr. Joseph Baril <br /> 9820 18th Avenue W <br /> Everett, WA 98204 <br /> Email Address: [optional] <br /> RE: Owner: Houng & Joseph Baril <br /> Job Address: 9820 18th Avenue W <br /> Plan Check Number: B2202-062, First Building Review <br /> Dear Mr. Baril, <br /> The proposed project has been reviewed for compliance with the provisions of the building codes <br /> adopted and amended by the state of Washington and the city of Everett. The comments below <br /> must be addressed before a permit can be issued. These comments address building issues only. <br /> Additional comments may be issued by the Public Works, Planning, and Fire departments. <br /> Code citations provided in the following review comments reference the Everett Municipal Code <br /> (EMC) and the 2018 International Residential Code (IRC). Amendments to the adopted building <br /> codes by Washington Administrative Code (WAC) Title 51 are incorporated into the referenced code <br /> citations. Citations provided in the comments reference the IRC unless noted otherwise. The <br /> codes, including WAC amendments where applicable, can be viewed using the following links: <br /> • EMC: M`f� .rrr ice`* <br /> • 2018 IRC: ittpsi/up.codesty wer/ sh,n jwa-re e a--c -? U 8 <br /> • 2018 IBC: "ziact e rrs - e 2- <br /> • 2018 WSEC: tt;as fu .cc vi a ert aS r_': -et •- -r; ,_i <br /> • WAC: t :4710 .c1 .f4u .4 <br /> In order for the processing of your application to continue, the following documentation shall be <br /> submitted to Permit Services for review: <br /> a. Itemized letter addressing the comments provided below. <br /> b. Two complete sets of revised construction drawings. <br /> c. Two copies of supplemental structural calculations (if appliable). <br /> Submittal documents should contain sufficient information and detail to review the proposed project <br /> for compliance with the adopted building codes. Upon submittal of the revised documents, your <br /> application will be given priority and the review will recommence. <br /> Page 1 of 3 <br />