Laserfiche WebLink
CITY OF EVERETT PUBLIC WORKS  SMITH ISLAND ESTUARY RESTORATION ADVANCE MITIGATION SITE: YEAR 7 MONITORING <br />Page 1 | February 18, 2025 <br />EXHIBIT A: SCOPE OF WORK <br />SMITH ISLAND ESTUARY RESTORATION ADVANCE MITIGATION SITE: YEAR 7 <br />MONITORING <br />PREPARED BY: <br />Natural Systems Design, Inc. <br />PREPARED FOR: <br />City of Everett Public Works <br />Heather Griffin, PE, Surface Water Manager <br />City of Everett Public Works Department <br /> <br />February 18, 2025 <br />