Laserfiche WebLink
CITY OF EVERETT PUBLIC WORKS DEPARTMENT  SMITH ISLAND ESTUARY RESTORATION ADVANCE MITIGATION SITE: YEAR 7 MONITORING <br />Page 2 | February 18, 2025 <br />INTRODUCTION <br />City of Everett Public Works Department (EPWD) has requested Natural Systems Design, Inc. (NSD) <br />support the EPWD by completing an expanded Year 7 monitoring effort for the Smith Island Estuary <br />Restoration Advance Mitigation Site (the project). The project was constructed as advance <br />compensatory mitigation for EPWD anticipated future unavoidable impacts to wetlands and waters, as <br />specified in Table 1-1 of the Advance Mitigation Plan (ICF 2016) within the project’s defined geographic <br />area. The Advance Mitigation Plan specifies performance monitoring across a 10-year monitoring <br />period, or until the performance standards are met. The performance standards were met at Year 5 and <br />EPWD has requested early termination of the quantitative monitoring. Coordination with the U.S. Army <br />Corps of Engineers occurred in late 2024 and January 2025 and concluded with the request that EPWD <br />complete all elements of the monitoring required in Year 10 to verify standards are being met and to <br />essentially replicate the Year 5 monitoring and thus produce data from two consecutive monitoring <br />years. <br />At the request of EPWD, NSD will complete an expanded Year 7 performance monitoring and reporting <br />consistent with the monitoring tasks required for Year 7, as well as the expanded suite required at Year <br />10. NSD will replicate the elements and methods specified in the Advance Mitigation Plan, consistent <br />where applicable with the methods and approach utilized for Years 1 through 6 monitoring. Year 1 was <br />completed by ICF in 2019 and NSD completed Years 2, 3, and 4 in 2020 through 2022 and Years 5 and 6 <br />in 2023 and 2024. <br />Work to be completed by NSD has been divided into the following list of tasks and linked to specific <br />project deliverables: <br /> Task 1: Estuarine Habitat Area Delineation, Hydrology, and Salinity <br /> Task 2: Wetland Vegetation Development <br /> Task 3: Fish Use Monitoring Support <br /> Task 4: Wildlife Use Monitoring <br /> Task 5: Monitoring Report <br /> Task 6: Agency Coordination & Meetings <br /> Task 7: Client Coordination & Project Management <br /> Task 8: Additional Unanticipated Services <br />For this project, NSD’s core team consists of Steve Winter, PWS, Principal In-Charge overseeing the <br />project team and supporting Project Manager and lead wetland biologist Torrey Luiting, PWS, Associate <br />Principal Ecologist. <br />Task 1. Estuarine Habitat Area Delineation, Hydrology, And Salinity <br />Per Tables 6-1 and 6-2 of the Advance Mitigation Plan, a verification of the Year 1 extent of estuarine <br />habitat based on Mean Higher High Water (MHHW) and verification that the site meets U.S. Army Corps <br />of Engineers Regulatory standards under the Clean Water Act as an estuarine wetland are required at <br />Year 10 and thus needs to be repeated as part of the expanded Year 7 monitoring. <br />Subtask 1.1 Verification of Estuarine Hydrology and Salinity <br />Part of the verification of estuarine habitat is the reverification that a natural diurnal tidal regime with <br />estuarine water salinity has been restored/is still present within the site comparable to that observed in