My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3214 BROADWAY SEPA 017 - 004 Geotech Report 2025-04-14
>
Address Records
>
BROADWAY
>
3214
>
SEPA 017 - 004
>
Geotech Report
>
3214 BROADWAY SEPA 017 - 004 Geotech Report 2025-04-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 7:52:01 AM
Creation date
4/3/2025 9:54:53 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3214
Tenant Name
SEPA 017 - 004
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
American Property Develov.nent ES-0599.05 <br /> January 16, 2015 Page 5 <br /> Updated January 22, 2015 <br /> This geotechnical engineering study has been prepared for the exclusive use of American <br /> Property Development and their representatives. The study has been prepared specifically for <br /> the subject project. No warranty, expressed or implied, is made. This study has been prepared <br /> in a manner consistent with the level of care and skill ordinarily exercised by other members of <br /> the profession currently practicing under similar conditions in this area. <br /> Site Preparation and Earthwork <br /> The primary geotechnical considerations with respect to earthwork are related to the proposed <br /> building's excavation, temporary slope construction, temporary excavation support, and <br /> foundation subgrade preparation. The soils encountered in the building excavations should <br /> largely consist of dense to very dense silty sand deposits. These soils should generally be <br /> suitable for use as structural backfill, where needed. The native soils can be characterized as <br /> having a generally moderate sensitivity to moisture. Therefore, if the soils are exposed to <br /> excessive moisture, successful placement and compaction of the soil may be difficult. <br /> Excavations <br /> As excavation of the proposed building progresses, the soil relative density should generally <br /> increase and is expected to exhibit good stability in open cut excavations. Overall stability of <br /> the excavation is anticipated to be good, provided appropriate means for sloping and shoring <br /> the excavation are utilized. Based on the soil conditions observed at the test sites, the <br /> following allowable temporary slope inclinations can be used: <br /> • Upper 4 Feet of Excavation 1 H:1 V (Horizontal:Vertical) <br /> • Below 4 Feet 0.5H:1V to 0.75H:1V <br /> The geotechnical engineer should observe the excavation and assess the allowable temporary <br /> slope inclination based on the soil and groundwater conditions exposed in the excavation. <br /> Supplement recommendations for sloping the excavation may be made by the geotechnical <br /> engineer based on conditions observed. <br /> With respect to temporary shoring, recommendations are provided in the Shoring <br /> Recommendations section of this study. <br /> Structural Fill <br /> We anticipate structural fill placement will generally be required behind foundation walls and <br /> within utility trench excavations. Structural fill may also be necessary in slab-on-grade areas. <br /> Where structural fill is necessary below the proposed building foundations, a suitable crushed <br /> rock material should be used. In our opinion, clean crushed rock consisting of one and one half <br /> inch to two inch aggregate should be used below foundations where fill placement is necessary. <br /> Earth Solutions NW, LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.