Laserfiche WebLink
Table of Contents <br /> ES-0599.05 <br /> PAGE <br /> INTRODUCTION 1 <br /> General 1 <br /> Project Description 2 <br /> Surface 2 <br /> Subsurface 2 <br /> Groundwater 3 <br /> Geologically Hazardous Areas And Environmental Sensitive <br /> Features Review 3 <br /> DISCUSSION AND RECOMMENDATIONS 4 <br /> General 4 <br /> Site Preparation and Earthwork . 5 <br /> Excavations 5 <br /> Structural Fill 5 <br /> Erosion Control 6 <br /> Shoring Recommendations 6 <br /> Soil Nail Wall Recommendations 7 <br /> Cantilever and Single Tieback Soldier Piles 7 <br /> Active Earth Pressures 8 <br /> At-Rest Earth Pressures 8 <br /> Multiple Tieback Walls 8 <br /> Soldier Piles 8 <br /> Timber Lagging 9 <br /> Tieback Anchors 9 <br /> Shoring Wall Drainage 9 <br /> Shoring Monitoring 10 <br /> Foundations 10 <br /> Slab-on-Grade Floors 11 <br /> Retaining Walls 11 <br /> Site Retaining Walls... 11 <br /> Excavations and Slopes 12 <br /> Seismic Considerations 12 <br /> Drainage 13 <br /> Utility Trench Backfill 13 <br /> LIMITATIONS 13 <br /> Additional Services 13 <br />