My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3214 BROADWAY SEPA 017 - 004 Land Use Decision Documents 2025-04-14
>
Address Records
>
BROADWAY
>
3214
>
SEPA 017 - 004
>
Land Use Decision Documents
>
3214 BROADWAY SEPA 017 - 004 Land Use Decision Documents 2025-04-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 7:48:42 AM
Creation date
4/3/2025 10:51:38 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3214
Tenant Name
SEPA 017 - 004
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e. Will the project or proposal use(or occur in the immediate vicinity of)water,rail, or air transportation? <br /> If so, generally describe. <br /> No. <br /> f. How many vehicular trips per day would be generated by the completed project or proposal?If known, <br /> indicate when peak volumes would occur and what percentage of the volume would be trucks(such as <br /> commercial and nonpassenger vehicles).What data or transportation models were used to make these <br /> estimates? <br /> Please refer to the Gibson Traffic Study for the proposed project dated January 22,2015. <br /> g.Will the proposal interfere with, affect or be affected by the movement of agricultural and forest <br /> products on roads or streets in the area?If so, generally describe. <br /> None are known at this time. <br /> h.Proposed measures to reduce or control transportation impacts,if any: <br /> None are warranted at this time. <br /> 15. Public Services <br /> a. Would the project result in an increased need for public services(for example: fire protection,police <br /> protection,public transit,health care, schools,other)? If so,generally describe. <br /> The proposed project has the potential to increase the need for public services such as fire/police <br /> protection and health care. <br /> b. Proposed measures to reduce or control direct impacts on public services,if any. <br /> The project will have fire sprinklers to reduce the possible increase in demands for fire protection. <br /> Lighting and security design will assist in decreasing any possible impact for police protection. <br /> Impact fees will be paid to help mitigate the service impacts. <br /> 16. Utilities <br /> a. Circle utilities currently available at the site: <br /> electricity,natural gas,water,refuse service,telephone, sanitary sewer, septic system, <br /> other . <br /> b. Describe the utilities that are proposed for the project,the utility providing the service, <br /> and the general construction activities on the site or in the immediate vicinity which might <br /> be needed. <br /> PSE will provide gas,PU )will provide electric,Comcast and/or Century Link will provide <br /> phone,cable and internet, and the City of Everett will provide water and sewer. <br /> SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 12 of 14 <br /> /0/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.