Laserfiche WebLink
C. Signature <br /> The above answers are true and complete to the best of my knowledge. I understand that the lead agency <br /> is relying on them to make its ecision. <br /> Signature: cif <br /> Name of signee Dave Sinnett <br /> Position and Agency/Organization Director of Development/American Property Development Inc. <br /> Date Submitted: 2/1/2017 <br /> D. supplemental sheet for nonproject actions <br /> (IT IS NOT NECESSARY to use this sheet for project actions) <br /> Because these questions are very general,it may be helpful to read them in conjunction <br /> with the list of the elements of the environment. <br /> When answering these questions,be aware of the extent the proposal,or the types of <br /> activities likely to result from the proposal,would affect the item at a greater intensity or <br /> at a faster rate than if the proposal were not implemented. Respond briefly and in general terms. <br /> 1. How would the proposal be likely to increase discharge to water; emissions to air;pro- <br /> duction, storage,or release of toxic or hazardous substances;or production of noise? <br /> Proposed measures to avoid or reduce such increases are: <br /> 2. How would the proposal be likely to affect plants,animals,fish,or marine life? <br /> Proposed measures to protect or conserve plants,animals,fish,or marine life are: <br /> 3. How would the proposal be likely to deplete energy or natural resources? <br /> Proposed measures to protect or conserve energy and natural resources are: <br /> 4. How would the proposal be likely to use or affect environmentally sensitive areas or <br /> areas designated(or eligible or under study)for governmental protection; such as parks, <br /> SEPA Environmental checklist(WAC 197-11-960) Jul 2016 Page 13 of 14 <br />