Laserfiche WebLink
iAr`;•/' P D American Property Development, Inc, <br /> �•� <br /> 110 . 110tli Avenue N.E., Suite 550 <br /> Bellevue,Washington 98004 <br /> Telephone 425.455.2433 <br /> Fax 425.709.7214 <br /> The majority of the site will be built out to the lot line. Street trees along Broadway will <br /> be provided as per the ROW EMC 19.31A.040 subsection F.1 and a landscaped section is <br /> proposed for a portion of the property to the North of the building. Additional landscaping and <br /> site amenities will be provided at the main entrance on Broadway and on the 3rd floor deck. <br /> Screening requirements do not apply as the dumpster, garbage and recycling areas are internal to <br /> the building. Access to the garbage and recycling will be provided off the 2nd parking floor <br /> directly from the alley on the West side of the building. <br /> We have received updated will serve letters from Puget Sound Energy,Public Utility <br /> District and Comcast. Connection for sewer and storm is proposed for a new manhole on the <br /> NW corner of 32nd and Broadway and to bore beneath Broadway to connect to the existing <br /> manhole on the NE corner of 32nd and Broadway. We are in the process of finalizing our civil <br /> sheets to illustrate our intended stoini/sewer connection and boring details. Once complete we <br /> will submit to the City with our civil/public works submittal. <br /> EMC 19.34.020 subsection B1 requires a 1:1 parking ratio for one or fewer bedroom <br /> units, and 1:1.5 parking spaces for two or more bedroom units. Our proposed development <br /> consists of 70 one bedroom or studio units and 70 two bedroom units which equates to 175 <br /> required parking spaces. Our design provides for approximately 216 parking spots providing a <br /> cumulative ratio of 1:1.54 parking spaces for each unit and exceeds this requirement. We <br /> originally proposed driveway ingress/egress to the parking garage off of Broadway in addition to <br /> the alleyway. After the City expressed their preference that Broadway not be used for garage <br /> access we modified our design to provide access from 32nd street, a less trafficked thoroughfare. <br /> Therefore the lower level of parking is designed to include one right in/right out off of 32nd St. <br /> while the upper level of parking is designed to include one entrance/exit off of the West alley. <br /> This design eliminates any need for parking access from Broadway as the City has requested. <br /> We have included an updated traffic impact report from Gibson based on 140 market rate <br /> apartment units as part of this land use application. The report indicates that the development is <br /> anticipated to generate 479 average daily trips and 48 new PM peak-hour trips and will therefore <br /> have traffic mitigation fees of$115,200. The traffic reports site access analysis also states that <br /> 579- <br />