Laserfiche WebLink
3) Describe any toxic or hazardous chemicals that might be stored, used, or produced <br /> during the project's development or construction, or at any time during the operating <br /> life of the project. <br /> None known <br /> 4) Describe special emergency services that might be required. <br /> No special enrergwtcy services are anticipated for the project. <br /> 5) Proposed measures to reduce or control environmental health hazards, if any: <br /> fill paints,sealants, caulking and adhesives will he lour i'OC. Materials nil!be chosen for <br /> being environmentally preferred materials such as products that arc locally manufactured or <br /> have recycled content. Alaierials will also be selected to prevent mold and are durable and <br /> easy to clean. Cabinets and other composite wood products will be formaldehyde free. No <br /> carpet will be used in the building to cut down on the accumulation of dust and allergens. All <br /> flooring will be Floorscore certified. )Palk-off mats will he provided at the entry vestibule to <br /> reduce the accumulation of dirt and allergens. Continuous whole-house mechanical ventilation <br /> will he provided in the building and the units <br /> b. Noise <br /> 1) What types of noise exist in the area which may affect your project(for example: <br /> traffic, equipment, operation,other)? <br /> Traffie noise.Iron,Evergreen IYay and occasional nossc f om the fire training facilio.nest door. <br /> 2)What types and levels of noise would be created by or associated with the project on a <br /> short-term or a long-term basis(for example: traffic, construction, operation, other)? Indi- <br /> cate what hours noise would come from the site. <br /> Typical construction noise during normal busines•.s hours. After occupancy there will he minimal <br /> noise impacts. Long term noise would be related to typical residential activities. Ongoing <br /> building maintenance n ill he done chrring normal business hours, witiclr may include some of <br /> these activities: landscaping nurint mrnee noises, minimal cars coining and going/i•on►the.site <br /> and residents interacting in their outdoor amenities area.All residential outdoor common areas <br /> are located on the west side of the property which it'll!be shielded to the residential properties to <br /> the south and east by the new building and a new landscape buffer.. <br /> 2) Proposed measures to reduce or control noise impacts, if any: <br /> Noise will be limited to Alortdat•through Friday from 7arn-5pm. Construction!cant will submit <br /> monthly work schedules to surrounding property outer a with dater indicated for lord noise <br /> activities. Rork on Saturday will only occur with City of Everett'c approval. <br /> 8. Land and Shoreline Use <br /> a. What is the current use of the site and adjacent properties?Will the proposal affect <br /> current land uses on nearby or adjacent properties? If so, describe. <br /> SEPA Environmental checklist MAC 191-11.960) July2016 Page 8 of 16 <br />