Laserfiche WebLink
Limited erosion could occur as a result of the initial construction; however, <br /> erosion control measures will be utilized during construction phase to minimize <br /> potential erosion impacts. Temporary erosion control plans will be submitted to <br /> Snohomish County for approval prior to any clearing and grading activity. <br /> g. About what percent of the site will be covered with impervious surfaces after project <br /> construction (for example, asphalt or buildings)? jhelpj <br /> 81% <br /> h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: <br /> jhelpj <br /> A Temporary Erosion and Sediment Control (TESC) plan designed in accordance <br /> with City of Everett standards will be employed during the construction phase of <br /> the project. <br /> 2.Air [help] <br /> a. What types of emissions to the air would result from the proposal during construction, <br /> operation, and maintenance when the project is completed? If any, generally describe <br /> and give approximate quantities if known. jhelpl <br /> Heavy equipment operation and worker's vehicles will generate exhaust <br /> emissions to the local air. Construction activity on-site could also stir up exposed <br /> soils and generate dust into the local air. The completed project will result in a <br /> minor increase in the amount of exhaust related pollutants in the local air from <br /> project related traffic. <br /> b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, <br /> generally describe. jhelpj <br /> The applicant is not aware of any offsite source of emissions that may affect the <br /> proposal. <br /> c. Proposed measures to reduce or control emissions or other impacts to air, if any: jhelpj <br /> Watering of the site as necessary during the construction phase of the project will <br /> help control dust and other particulates. <br /> 3. Water [help] <br /> a. Surface Water: <br /> 1) Is there any surface water body on or in the immediate vicinity of the site(including <br /> year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe <br /> type and provide names. If appropriate, state what stream or river it flows into. [help] <br /> Yes, the Snohomish River is within the immediate vicinity. <br /> 2)Will the project require any work over, in, or adjacent to (within 200 feet)the described <br /> waters? If yes, please describe and attach available plans. jhelpj <br /> Yes, a portion of the southwest corner will be within 200 feet of the development, <br /> however, not within the 50-foot buffer. <br /> SEPA Environmental checklist(WAC 197-11-960) July 2016 Page 4 of 14 <br />