Laserfiche WebLink
7h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the <br /> impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a <br /> similar table, you can state (below)where we can find this information in the plan. [ieip] <br /> Activity(fill, Wetland Wetland Impact Duration Proposed Wetland <br /> drain, excavate, Name' type and area (sq. of impact' mitigation mitigation area <br /> flood, etc.) rating ft. or type4 (sq. ft. or <br /> category' Acres) acres) <br /> If no official name for the wetland exists,create a unique name(such as'Wetland 1"). The nan ie should be consistent with other project documents, <br /> such as a wetland delineation report. <br /> 2 Ecology wetland category based on current Western Washington or Eastern Washington Wetla id Rating System.Provide the wetland <br /> rating forms with the JARPA package. <br /> 3lndicate the days,months or years the wetland will be measurably impacted by the activity.Ent N."permanent"if applicable. <br /> Creation(C),Re-establishment/Rehabilitation(R), Enhancement(E),Preservation(P), Mitigatic n Bank/In-lieu fee(B) <br /> Page number(s) for similar information in the mitigation plan, if av 3ilable: <br /> 7i. For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in <br /> cubic yards that will be used, and how and where it will be placed into the wetland. [help] <br /> No fill will be placed in any wetland. <br /> 7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in <br /> cubic yards you will remove, and where the material will be disposed. [help] <br /> Not applicable <br /> Part 8—Waterbodies (other than wetlands): Impacts and Mitigation <br /> In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) [help] <br /> ® Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.) <br /> JARPA Revision 2015.1 Page 9 of 18 <br />