My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9530 HOLLY DR 2025-08-05
>
Address Records
>
HOLLY DR
>
9530
>
9530 HOLLY DR 2025-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 10:55:19 AM
Creation date
4/4/2025 9:21:10 AM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
9530
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9�i1a9&yIll I:VlLlFil &II-VlLl10LViIIll I[Hil9Eel Lll <br />This residential development is expected to add an assumed 29,679 sf for future <br />private road, driveways and roofs. However, the effective impervious surfaces for this <br />project total less than 10,000 sf (see section 7 and 9 of this report). <br />The runoff from the new private road and the roof surfaces on lot 3 will be directed to <br />individual bioretention cells, and all of the individual driveways will be constructed of <br />permeable pavement. Roof runoff from lots 1, 2, 4, 5 and 6 will be collected and <br />tightlined to the existing stormwater conveyance system within the Holly Drive right of <br />way due to lack of available space for infiltration. <br />A. UPSTREAM ANALYSIS <br />There are no significant off -site areas that drain toward the proposed project area. All <br />off -site flows will pass through or around this site and remain that way during <br />construction. Based on the location of the proposed improvements the existing runoff <br />from the upstream area will continue to flow unaffected around this site after the <br />project has been constructed. <br />B. DOWNSTREAM ANALYSIS <br />Runoff from the proposed disturbance area of the existing site sheet flows in a <br />generally southern direction and flows through a culvert near the southeastern <br />property line and into a catch basin within Holly Drive right of way. Runoff in this <br />stormwater conveyance main runs southwest down Holly Drive approximately 750 <br />feet, at which point the downstream analysis was concluded. <br />See Figure 4 for Downstream Basin. <br />Perez SP <br />March 2022 <br />Revised: June/August 2022 Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.