A drip pan or other appropriate temporary containment device shall be placed at <br />locations where leaks or spills may occur during the fueling or maintenance of <br />machinery. <br />10: Control DeWatering <br />DeWatering may be necessary for this project. However, the existing vegetation <br />retained on site would be available to spread any water from construction for filtration <br />and disposal. <br />11: Maintain BMPs <br />The construction supervisor will be responsible for maintaining all BMPs during <br />construction and working with the City to relocate or add BMPs as necessary as site <br />conditions change. BMPs should be inspected and maintained as needed after every <br />rain event producing more than Yd' of rain in a 24-hour period. Also, BMPs shall be <br />inspected on a weekly basis even if site work is not occurring. <br />12: Manage the Project <br />It will be the responsibility of the Contractor and Developer to manage this project and <br />coordinate with the City Inspector and Engineer. <br />Inspection and Monitoring: <br />Site inspections shall be done by a person who is knowledgeable in the principles and <br />practices of erosion and sediment control. The person must have skills to first assess <br />the site conditions and construction activities that could impact the quality of <br />stormwater, and second assess the effectiveness of erosion and sediment control <br />measures used to control the quality of stormwater discharges. <br />Whenever inspection and/or monitoring reveals that the BMPs identified in the <br />Construction SWPPP are inadequate, due to the actual discharge of or potential to <br />discharge a significant amount of any pollutant, appropriate BMPs or design changes <br />shall be implemented as soon as possible. <br />Maintaining an Updated Construction SWPPP: <br />The construction SWPPP shall be retained on -site or within reasonable access to the <br />short plat. The SWPPP shall be modified whenever there is a change in the design, <br />construction, operation, or maintenance at the construction site that has, or could <br />have, a significant effect on the discharge of pollutants to waters of the state. <br />The SWPPP shall be modified if, during inspections or investigations conducted by the <br />owner/operator, or the applicable local or state regulatory authority, it is determined <br />that the SWPPP is ineffective in eliminating or significantly minimizing pollutants in <br />stormwater discharges from the site. The SWPPP shall be modified as necessary to <br />include additional or modified BMPs designed to correct problems identified. <br />Revisions to the SWPPP shall be completed within seven days following inspection. <br />Perez SP <br />March 2022 <br />Revised: June/August 2022 Page 9 <br />