My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9530 HOLLY DR 2025-08-05
>
Address Records
>
HOLLY DR
>
9530
>
9530 HOLLY DR 2025-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 10:55:19 AM
Creation date
4/4/2025 9:21:10 AM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
9530
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13: Protect On -Site Stormwater Management BMPs for Runoff from Hard Surfaces <br />The use of infiltration BMPs for this project will allow for the installation of the <br />bioretention cells, permeable pavement and soil amendments at the end of the project <br />during final stabilization. Those should be protected from compaction to the maximum <br />extent feasible during construction. High -visibility fencing shall be used around the <br />bioretention areas to provide extra protection during construction. <br />Perez SP <br />March 2022 <br />Revised: June%4ugust2022 Page10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.