My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
400 RIVERSIDE RD SEPA 016 - 039 - RIVERSIDE BUSINESS PARK Geotech Report 2025-04-14
>
Address Records
>
RIVERSIDE RD
>
400
>
SEPA 016 - 039 - RIVERSIDE BUSINESS PARK
>
Geotech Report
>
400 RIVERSIDE RD SEPA 016 - 039 - RIVERSIDE BUSINESS PARK Geotech Report 2025-04-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 7:58:17 AM
Creation date
4/4/2025 11:43:01 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
400
Tenant Name
SEPA 016 - 039 - RIVERSIDE BUSINESS PARK
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 8, 2016 <br /> Project No. T-7388-1 <br /> Based on the soil conditions encountered and the local geology, the 2012 International Building Code (IBC) <br /> indicates that site class "D" should be used in structural design. <br /> ' Seismic Design Parameters (IBC 2012/2015) <br /> Spectral response acceleration (Short Period), SMs 1.239 <br /> ' Spectral response acceleration (1 —Second Period), SMI 0.719 <br /> Five percent damped 0.2-second period, SDs 0.826 <br /> Five percent damped 1-second period, SDJ 0.479 <br /> The above values are for Latitude 48.00842N and Longitude -122.18405W, and were obtained from United <br /> States Geological Survey(USGS)Ground Motion Parameter Calculator(accessed November 22,2016). <br /> 5.0 DISCUSSION AND RECOMMENDATIONS <br /> ' 5.1 General <br /> Based on our study, in our opinion, development of the site as proposed is feasible from a geotechnical <br /> ' engineering standpoint. The primary geotechnical concern at the site is the presence of compressible soil strata <br /> susceptible to consolidation under the planned building loads. The compressible soil consists of a 4- to 11-foot <br /> thick layer of soft to medium stiff silt and clay underlying the site's upper fills. These soils are highly <br /> compressible and if not mitigated, unacceptable levels of differential building settlement would likely occur <br /> under proposed project loads. Given the depth to the very soft soil layer, in our opinion, the potential post <br /> ' construction building settlements can be mitigated by implementing a fill surcharge program. <br /> The existing fills at the site consist mostly of silty sand soils and variably thick layers of sandy silt. The CPT <br /> data indicate the fill to be predominantly in a medium dense to dense condition; however, CPT-4 and CPT-6 <br /> show that some of the fills are loose. Based on the data, in most site areas the medium dense fills appeared <br /> suitable for support of new fill, pavements, or building elements. Where loose soils are present, it will be <br /> ' necessary to remove the soils to a minimum depth of two feet below base-of-footing elevation and replace with <br /> compacted structural fill. The need for overexcavation will require confirmation by geotechnical observation and <br /> testing at the time of grading as outlined in the following Site Preparation and Grading Section. The existing fill <br /> and underlying native soils are moisture sensitive and close moisture control will be required to facilitate <br /> structural compaction of the soils if used as fill from site excavations. <br /> Detailed recommendations regarding these issues and other geotechnical design considerations are provided in <br /> the following sections. These recommendations should be incorporated into the final design drawings and <br /> construction specifications. <br /> 1 <br /> Page No. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.