Laserfiche WebLink
13. Lack of comment on the plans submitted with the application does not constitute approval of <br /> these plans. <br /> 14. As-builts of storm sewer, sanitary sewer, and water systems will be required to be submitted per <br /> City Design and Construction Standards and Specifications for Development. <br /> 15. Any broken or damaged sidewalk shall be repaired/replaced per the City standards. <br /> 16. The sewer main in the alley is overloaded. A backwater valve must be installed on all new <br /> sewer main connections. <br /> 17. If the proposed fill is intended to support structures at a later date, the fill shall be placed in <br /> accordance with Appendix J of the International Building Code. Should the applicant not wish <br /> to construct a fill intended to support a structure at a later date, the applicant will be required to <br /> submit a letter to the City so stating. The letter will be recorded against the property. <br /> 18. Walkways must be provided from the building entrance to the public sidewalk.. <br /> 19. The construction plans must be designed from a site survey performed by a licensed State of <br /> Washington land surveyor. <br /> 20. A note must be placed on the final plat map that no direct access will be allowed to <br /> 21. Soil compaction testing shall be performed throughout the construction of the public street and <br /> utilities. Density curves shall be submitted to the Public Works Department prior to permits <br /> being issued for any aspect of the project. All work performed by the geotechnical engineer or <br /> testing lab shall be reported directly to the City Public Works Inspector before covering work <br /> can be continued by the contractor. Daily reports shall be kept by the soils investigator/tester <br /> and submitted to the Public Works Inspector within 24 hours. <br /> 22. All exposed ground must be reseeded within 30 days of the completion of construction. If <br /> reseeding is not practical due to weather or seasonal problems, the ground must be covered with <br /> mulch as directed by the City Engineer. <br /> 23. Temporary erosion control measures for construction activity must be operational prior to <br /> commencement of any clearing or earthwork. <br />