My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3710 TULALIP AVE SEPA 016 - 015 Land Use Decision Documents 2025-05-12
>
Address Records
>
TULALIP AVE
>
3710
>
SEPA 016 - 015
>
Land Use Decision Documents
>
3710 TULALIP AVE SEPA 016 - 015 Land Use Decision Documents 2025-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2025 1:27:49 PM
Creation date
4/4/2025 2:13:57 PM
Metadata
Fields
Template:
Address Document
Street Name
TULALIP AVE
Street Number
3710
Tenant Name
SEPA 016 - 015
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br /> 25. The construction plans must be designed from a site survey performed by a licensed State of <br /> Washington land surveyor. <br /> 26. A note must be placed on the final plat map that no direct access will be allowed to <br /> 27. Soil compaction testing shall be performed throughout the construction of the public street and <br /> utilities. Density curves shall be submitted to the Public Works Department prior to permits <br /> being issued for any aspect of the project. All work performed by the geotechnical engineer or <br /> testing lab shall be reported directly to the City Public Works Inspector before covering work <br /> can be continued by the contractor. Daily reports shall be kept by the soils investigator/tester <br /> and submitted to the Public Works Inspector within 24 hours. <br /> 28. All exposed ground must be reseeded within 30 days of the completion of construction. If <br /> reseeding is not practical due to weather or seasonal problems, the ground must be covered with <br /> mulch as directed by the City Engineer. <br /> 29. Temporary erosion control measures for construction activity must be operational prior to <br /> commencement of any clearing or earthwork. <br />
The URL can be used to link to this page
Your browser does not support the video tag.