My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3710 TULALIP AVE SEPA 016 - 015 Land Use Decision Documents 2025-05-12
>
Address Records
>
TULALIP AVE
>
3710
>
SEPA 016 - 015
>
Land Use Decision Documents
>
3710 TULALIP AVE SEPA 016 - 015 Land Use Decision Documents 2025-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2025 1:27:49 PM
Creation date
4/4/2025 2:13:57 PM
Metadata
Fields
Template:
Address Document
Street Name
TULALIP AVE
Street Number
3710
Tenant Name
SEPA 016 - 015
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. What general types of soils are found on the site(for example,clay, sand,gravel,peat, muck)? <br /> If you know the classification of agricultural soils,specify them and note any prime farmland. <br /> Silty-sand fill and topsoil near the surface,dense clay at depth. <br /> d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, <br /> describe. No <br /> e. Describe the purpose, type,and approximate quantities of any filling or grading proposed. <br /> Indicate source of fill. <br /> Approximately 5,500 cubic yards excavation and backfill for pipes and manholes <br /> f. Could erosion occur as a result of clearing, construction, or use? If so,generally describe. No <br /> g. About what percent of the site will be covered with impervious surfaces after project <br /> construction (for example,asphalt or buildings)? Approximately 95%of the project area will be <br /> impervious. <br /> h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:BMPs <br /> for temporary erosion and sediment control during construction <br /> 2. Air <br /> a. What types of emissions to the air would result from the proposal (i.e.,dust, automobile, <br /> odors, industrial wood smoke)during construction and when the project is completed? If any, <br /> generally describe and give approximate quantities if known. There will be no increase in emissions <br /> by the completed project. Some occasional dust,diesel exhaust and sewer odor emissions may <br /> occur during construction. <br /> b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, <br /> generally describe.No <br /> c. Proposed measures to reduce or control emissions or other impacts to air, if any: Dust control <br /> measures will be implemented during construction as needed. <br /> 3. Water <br /> a. Surface: <br /> 1) Is there any surface water body on or in the immediate vicinity of the site (including year- <br /> round and seasonal streams, saltwater, lakes, ponds,wetlands)? If yes, describe type and provide <br /> names. If appropriate, state what stream or river it flows into.None <br /> 2930 Wetmore Avenue,Suite 8-A Everett,WA 98207. o 425.257.8731 a F 425.257.8742 0 www.everettwa.org ® Updated 2009 <br /> /e9. <br />
The URL can be used to link to this page
Your browser does not support the video tag.