Laserfiche WebLink
the frequency of CSO events. The proposed network improvements are aligned to avoid the majority of <br /> the existing utilities within the Hayes Street project area. Pipelines are proposed to occupy the Hayes <br /> Street right-of-way,the alley right-of-way,and an existing utility easement adjacent to the alley. <br /> Construction will be sequenced to manage flows and existing system operation for the duration of the <br /> project. <br /> 12. Location of the proposal. Give sufficient information for a person to understand the precise location of <br /> your proposed project, including a street address,if any,and section,township, and range, if known, If a <br /> proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal <br /> description,site plan,vicinity map,and topographic map, if reasonably available. While you should submit <br /> any plans required by the agency,you are not required to duplicate maps or detailed plans submitted with <br /> any permit applications related to this checklist. <br /> TO BE COMPLETED BY APPLICANT EVALUATION FOR <br /> AGENCY USE ONLY <br /> B. ENVIRONMENTAL ELEMENTS <br /> 1. Earth <br /> a. General description of the site(circle one): mostly Flat, rolling, hilly, steep slopes, mountainous, <br /> other <br /> b. What is the steepest slope on the site(approximate percent slope)? 5% <br /> • <br /> 8 <br /> } <br /> } <br /> 1/43 <br /> 2930 Wetmore Avenue,Suite 8-A Everett,WA 98201 @ 425.257.8731 ® i 425.257.8742 ®www.everettwa.org a Updated 2009 <br />