Laserfiche WebLink
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />5/29/2024 <br />5/29/2024 <br />FIRE 03-BLDG FINAL <br />BRONSON <br />CORRECTION <br />See notes <br />FOR FIRE <br />PEARSON <br />REQUIRED <br />Notes: <br />5/28/2024 7:36 AM Peter Meyer <br />Contact Name: Peter Meyer <br />Site Address: 12800 19TH AVE SE <br />Phone:4255338204 <br />e-Mail: peter@summitccllc.com <br />Okay to final once mailboxes are installed and all membrane closed. <br />5/31/2024 <br />5/31/2024 <br />TEMP CERTIFICATE <br />Matt Schreifels <br />APPROVAL <br />30 Day T.C.O (See notes) <br />OF OCCUPANCY <br />Notes: <br />5/29/2024 10:56 AM Peter Meyer <br />Contact Name: Peter Meyer <br />Site Address: 12800 19TH AVE SE <br />Phone:4255338204 <br />e-Mail: peter@summitccllc.com <br />pulled forward from 6/6 to 5/31/24 per contractors request <br />mas changed Inspection Type from BLDG 16-FINAL to TEMP CERTIFICATE OF OCCUPANCY <br />30 Day T.C.O.Contractor And/or owner to ensure that areas, still under construction or cordoned off from the public.Once USPS relocates, temporary <br />mailbox to permanent location, schedule for final inspection. <br />9/13/2024 <br />9/13/2024 <br />BLDG 16-FINAL <br />Matt Schreifels <br />APPRVD-PERMIT <br />FINAL <br />Notes: <br />CALL PETER 425-599-8204 WANTS TO SEND PICS OF MAIL BOX <br />9/16/2024 <br />CERTIFICATE OF <br />permit Technician <br />OCCUPANCY <br />Notes: <br />I <br />Printed: Monday, 16 September, 2024 2 of 2 rk <br />SUPERION <br />