Laserfiche WebLink
There are no impacts anticipated, so no measures.to avoid or reduce them are planned. However, if <br /> contaminated soil and/or concrete is found, it will be transported to a facility licensed to accept <br /> such soil. <br /> b. Noise <br /> 1) What types of noise exists in the area which may affect your project(for example: traffic, <br /> equipment,operation,other)? <br /> Noise from aircraft operations(flights and testing activity) is present on the site. <br /> 2) What types and levels of noise would be created by or associated with the project on a <br /> short-term or a long-term basis(for example: traffic,construction,operation,other)? <br /> Indicate what hours noise would come from the site. <br /> Temporary construction noise would be created, but would not impact other surrounding properties <br /> due to distances. The completed project will provide infrastructure support only and will not <br /> impact noise or relocate any flightline stalls. <br /> 3) Proposed measures to reduce or control noise impacts,if any: <br /> Noise impacts will be minimal, so no controls are being proposed. <br /> 8. Land and Shoreline Use <br /> a. What is the current use of the site and adjacent properties? <br /> The Boeing site is an industrial property used for aircraft manufacturing and its related functions. <br /> Uses of neighboring properties are office and light industrial. There will be no change to current <br /> use of the site. <br /> b. Has the site been used for agriculture? If so,describe. <br /> It is possible, but not probable, that a portion of the area had been used for agriculture years ago. <br /> The Boeing site was mainly forested prior to 1966. <br /> c. Describe any structures on the site. <br /> The project site is within Boeing's flightline area in Everett, and contains various office, <br /> manufacturing and support structures. <br /> d. Will any structures be demolished? <br /> No <br /> e. What is the current zoning classification of the site? <br /> It is currently zoned M-2 Heavy Manufacturing. <br /> f. What is the current comprehensive plan designation of the site? <br /> 8 <br />