Laserfiche WebLink
The City of Everett Growth Management Comprehensive Plan Land Use map designates the site as <br /> 5.1 Heavy Industry. <br /> g. If applicable,what is the shoreline master program designation of the site? <br /> The project is not located within a Shoreline Master Program jurisdiction area(i.e. within 200 feet <br /> of a designated Shoreline of the State). Therefore, the project area is not identified with a <br /> designated shoreline use on the City of Everett Shoreline Master Plan Shoreline Use designations <br /> map. <br /> h. Has any part of the site been classified as an "environmentally sensitive" area? If so,specify. <br /> Lake Boeing is classified by the City of Everett as a wetland. The proposed project is located <br /> outside of required buffers for Lake Boeing. <br /> i. Approximately how many people would reside/work in the completed project? <br /> No changes are proposed. <br /> j. Approximately how many people would the completed project displace? <br /> None <br /> k. Proposed measures to avoid or reduce displacement impacts,if any: <br /> There are no impacts anticipated, so no measures to avoid or reduce them are planned. <br /> 1. Proposed measures to ensure the proposal are compatible with existing and projected land <br /> uses and plans,if any: <br /> The project site is currently zoned M-2 Heavy Manufacturing. The intent of the project is to <br /> support airplane manufacturing activities which are consistent with the uses and intensities allowed <br /> in the City's development regulations and with the uses listed in the Southwest Everett/Paine Field <br /> Subarea Plan Final EIS, Tables 3.1-1 and 3.1-2. <br /> 9. Housing <br /> a. Approximately how many units would be provided,if any? Indicate whether high,middle,or <br /> low-income housing. <br /> No housing will be provided as part of this project. <br /> b. Approximately how many units,if any,would be eliminated? Indicate whether high,middle, <br /> or low-income housing. <br /> No housing will be eliminated as part of this project. <br /> c. Proposed measures to reduce or control housing impacts,if any: <br /> There are no impacts anticipated, .so no measures to avoid or reduce them are planned. <br /> 9 <br />