Laserfiche WebLink
13. Historic and Cultural Preservation <br /> a. Are there any places or objects listed on,or proposed for,national,state,or local preservation <br /> registers known to be on or next to the site? If so,generally describe. <br /> There are no places or objects known to be on, or proposed for, national, state, or local <br /> preservation registers. <br /> b. Generally describe any landmarks or evidence of historic,archaeological,scientific,or <br /> cultural importance known to be on or next to the site. <br /> There is nothing of historic, archaeological, scientific, or cultural significance known to be near the <br /> project site. <br /> c. Proposed measures to reduce or control impacts,if any: <br /> There are no impacts anticipated, so no measures to avoid or reduce them are planned. <br /> 14. Transportation <br /> a. Identify public streets and highways serving the site,and describe proposed access to the <br /> existing street system. Show on site plans,if any. <br /> The specific disposal site has not been selected yet. This information will be provided as part of the <br /> Public Works permit for the project. <br /> b. Is site currently served by public transit? If not,what is the approximate distance to the <br /> nearest transit stop? <br /> Yes, the Boeing plant is served by several transit agencies with multiple stops around the site. <br /> c. How many parking spaces would the completed project have? How many would the project <br /> eliminate? <br /> The proposed project will neither add nor remove parking stalls. <br /> d. Will the proposal require any new roads or streets,or improvements to existing roads or <br /> streets,not including driveways? If so,generally describe(indicate whether public or <br /> private). <br /> No new public or private roads, streets, or improvements are required. <br /> e. Will the project use(or occur in the immediate vicinity of)water,rail,or air transportation? <br /> If so,generally describe. <br /> The project is not in the vicinity of nor will it use water, rail, or air transportation. The trucks <br /> hauling soil will utilize public roadways. <br /> f. How many vehicular trips per day would be generated by the completed project? If known, <br /> indicate when peak volumes would occur. <br /> 11 <br />