Laserfiche WebLink
The completed project will add no additional vehicle trips. <br /> g. Proposed measures to reduce or control transportation impacts,if any: <br /> There are no impacts anticipated, so no measures to avoid or reduce them are planned. <br /> 15. Public Services <br /> a. Would the project result in an increased need for public services(for example: fire protection, <br /> police protection,health care,schools,other)? If so,generally describe. <br /> The project would not result in an increased need for public services. <br /> b. Proposed measures to reduce or control direct impacts on public services,if any: <br /> There are no impacts anticipated, so no measures to avoid or reduce them are planned. <br /> 16. Utilities <br /> a. C. 1P i tilities i available at the site: • •_ !. 1D •fuse servic• <br /> elephon• Italerrobseptic system,other:None <br /> b. Describe the utilities that are proposed for the project,the utility providing the service,and <br /> the general construction activities on the site or in the immediate vicinity which might be <br /> needed. <br /> No utilities are being proposed. <br /> C. SIGNATURE • <br /> The above answers are true and complete to the best of my knowledge. I understand that the lead agency <br /> is relying on them to make its decision. <br /> (- 01.2 <br /> Signature: / <br /> Date Submitted: (( 7/(6 <br /> 12 <br />