Laserfiche WebLink
reports shall be kept by the soils investigator/tester and submitted to the Public Works Inspector <br /> within 24 hours. <br /> 11. All exposed ground must be reseeded within 30 days of the completion of construction. If <br /> reseeding is not practical due to weather or seasonal problems, the ground must be covered with <br /> mulch as directed by the City Engineer. <br /> 12. Temporary erosion control measures for construction activity must be operational prior to <br /> commencement of any clearing or earthwork. <br />