Laserfiche WebLink
tilling, and harvesting? If so, how: <br />No. <br />c. Describe any structures on the site. <br />The only structures on the site are a 6,400 square foot two story building at the <br />southeast corner of the property once used as a training center by Weyerhaeuser <br />and a 1,000 square foot outbuilding further to the east. The training center <br />building has since been used for various purposes by the Port since acquisition <br />of the site. The buildings will be demolished as part of the subject project. <br />c. Will any structures be demolished? If so, what? <br />See narrative above. <br />d. What is the current zoning classification of the site? <br />M2-Heavy Industry <br />f. What is the current comprehensive plan designation of the site? <br />Heavy Industrial <br />g. If applicable, what is the current shoreline master program designation of the site? <br />Urban Industrial <br />i. Has any part of the site been classified as a critical area by the city or county? If so, specify. <br />me <br />i. Approximately how many people would reside or work in the completed project? <br />Sixty-two persons will work at the completed project. <br />j. Approximately how many people would the completed project displace? <br />None. <br />j. Proposed measures to avoid or reduce displacement impacts, if any: <br />Not applicable. <br />SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 12 of 17 <br />