Laserfiche WebLink
3. Address and phone number of applicant and contact person: <br />Applicant: <br />KW EVT LLC <br />Michael Fa <br />P.O. Box 979 <br />Telluride, CO 81435-0979 <br />Phone: (602) 432-3767 <br />Contact: <br />Wendell Johnson <br />Reid Middleton, Inc. <br />728 134th Street SW <br />Suite 200 <br />Everett, WA 98204 <br />Ph. 425-741-5021 <br />Email: wiohnson(aDreidmiddleton.com <br />4. Date checklist prepared <br />August 30, 2016 <br />5. Agency requesting checklist: <br />City of Everett, WA <br />Planning & Community Development <br />6. Proposed timing or schedule (including phasing, if applicable): <br />Construction on the overall site will begin upon issuance of all required permits, <br />likely in February or March of 2017. <br />7. Do you have any plans for future additions, expansion, or further activity related to or <br />connected with this proposal? If yes, explain. <br />Yes, although the entire site work portion of the Project is anticipated to be <br />completed during the initial construction phase, the Project is designed to expand <br />the cross -dock an additional 4 bays (16 dock doors). <br />8. List any environmental information you know about that has been prepared, or will be <br />prepared, directly related to this proposal. <br />• February 13, 2014 Riverside Business Park Development Guidelines prepared <br />for Port of Everett by Landau Associates to address environmental conditions <br />during intrusive activities. <br />• January 25, 2016 Department of Ecology guidance letter on development in <br />Riverside Business Park. <br />• November 3, 2014 GeoEngineers Mapping of Soils Investigations Locations <br />SEPA Environmental checklist (WAC 197-11-960) July 2016 Page 2 of 17 <br />