My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/06/01 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/06/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2016 9:55:43 AM
Creation date
6/8/2016 9:54:42 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/1/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Riverfront Development Sanitary Sewer <br /> 15 Lift Station Improvements' <br /> Change Order No.5 <br /> Change Order Effective Date:April 22, 2016 ; <br /> ciA <br /> Date: 57/z/16 Date: Date: Date: <br /> • <br /> CONTRACTOR <br /> BY f '- Date: 51 5 /1 <br /> I Officer <br /> Exhibit A—Description of Changed Work <br /> This change order#5 adds three (3)new bid items to Schedule"A", adds two(2)new bid items to <br /> Schedule"B" ,modifies one(1)existing bid item in Schedule"A", and modifies one(1)existing bid <br /> items in Schedule"B"as shown below. <br /> Added Bid Items <br /> Schedule "A"Bid Item#205—Lift Station 33 Electrical and Instrument Modifications. Add new <br /> bid item#205,entitled"Lift Station 33 Electrical and Instrument Modifications"at the agreed to lump <br /> sum price of$3,022.24,resulting in a$3,022.24 increase to the Contract price. <br /> Schedule"A"Bid Item#206—Lift Station 33-Eliminate Gypsum Wallboard. Add new bid item# <br /> 206, entitled"Lift Station 33-Eliminate Gypsum Wallboard"at the agreed to cost credit of$10,300.00, <br /> resulting in a$10,300.00 decrease to the Contract price. <br /> • <br /> Schedule "A"Bid Item#207—Lift Station 33 PUD Power Installation. Add new bid item#207, <br /> entitled"Lift Station 33 PUD Power Installation" at the agreed to lump sum price of$9,501.61, <br /> resulting in a$9,501.61 increase to the Contract price. <br /> • <br /> Schedule "B"Bid Item#107—Lift Station 43 Electrical and Instrument Modifications. Add new <br /> bid item# 107, entitled"Lift Station 43 Electrical and Instrument Modifications"at the agreed to lump <br /> sum price of$3,022.24,resulting in a$3,022.24 increase to the Contract price. <br /> Schedule "B"Bid Item# 108—Lift Station 43-Eliminate Gypsum Wallboard. Add new bid item <br /> # 108, entitled"Lift Station 43-Eliminate Gypsum Wallboard"at the agreed to cost credit of <br /> $3,000.00,resulting in a$3,000.00 decrease to the Contract price. <br /> Modified Bid Items <br /> Page 3 of 4 <br /> 188 <br />
The URL can be used to link to this page
Your browser does not support the video tag.