My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/06/01 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/06/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2016 9:55:43 AM
Creation date
6/8/2016 9:54:42 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/1/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Riverfront Development Sanitary Sewer 1, 5 <br /> Lift Station Improvements <br /> Change Order No.5 <br /> •Change Order Effective Date: April 22,2016 <br /> Schedule"A" Bid Item#22—Force Account. Modify existing bid item#22 entitled,"Force <br /> Account"by adding$40,000.00 to the Contract,resulting in a$40,000.00 increase to the Contract <br /> price. <br /> Schedule"B"Bid Item# 104—Force Account. Modify existing bid item# 104 entitled, "Force <br /> Account"by adding$40,000.00 to the Contract,resulting in a$40,000 increase to the Contract price. <br /> Exhibit B—Justification <br /> Schedule"A"Bid Item#205—Lift Station 33 Electrical and Instrument Modifications. <br /> Schedule"B"Bid Item#107—Lift Station 43 Electrical and Instrument Modifications. <br /> The City of Everett directed the contractor to install different instrumentation equipment than was <br /> required in the contract. These bid items are being added to account for costs to pay for <br /> instrumentation equipment to be installed,minus credits to the City of Everett for materials originally <br /> specified for this work at Lift Station 33 and 43. <br /> Schedule"A" Bid Item#206—Lift Station 33-Eliminate Gypsum Wallboard. <br /> Schedule"B"Bid Item# 108—Lift Station 43-Eliminate Gypsum Wallboard. <br /> The City of Everett directed the contractor to eliminate Gypsum Wallboard from the Contract because <br /> it is not a necessary material for the inside of a Sewer Lift Station Structure. The Contractor is <br /> providing an equitable adjustment cost credit to the City of Everett for the elimination of Gypsum <br /> Wallboard,and these bid items are being added to account for those cost credits. <br /> Schedule"A" Bid Item#207—Lift Station 33 PUD Power Installation. Snohomish County PUD <br /> required the installation of electrical conduit, and vaults before they would agree to provide power to <br /> Lift Station 33. This bid item is being added to account for costs to pay for work required by PUD. <br /> Schedule"A" Bid Item#22—Force Account. <br /> Schedule"B" Bid Item#104—Force Account. <br /> These bid items have-overrun their plan quantities and are being modified to account for and pay for <br /> costs incurred by the quantities overrun plus future increases to these bid items. <br /> This Change Order#5 results in an increase to the Contract price of$82,246.48. <br /> Exhibit C—Contract Time <br /> Two (2)working days are added to the Contract time resulting from Change Order#5 to <br /> account for additional electrical power work that was not part of the Contract. <br /> Page4of4 <br /> 189 <br />
The URL can be used to link to this page
Your browser does not support the video tag.