Laserfiche WebLink
1 <br /> the Contractor and not the result of an extenuating circumstance. All payments for liquidated <br /> damages shall be payable to"City of Everett". <br /> 3.1.1.2 11.4.1 For each Normal Operations "Non-Code" request that <br /> exceeds 14:59 minutes, the Contractor shall be assessed liquidated <br /> damages at a rate of fifty dollars ($50) per minute or fraction thereof for <br /> each minute late up to five minutes. For any response greater than 5 <br /> minutes late, the Contractor shall be deemed to have failed to respond to <br /> the request and a total of five hundred dollars ($500) in liquidated damages <br /> will be assessed for a failed response. <br /> 3.1.1.3 <br /> 3.1.1.4 11.4.2 For each Normal Operations "Code" request that <br /> exceeds 9:59 minutes, the Contractor shall be assessed liquidated <br /> damages at a rate of fifty dollars ($50) per minute or fraction thereof for <br /> each minute late up to five minutes. For any response greater than 5 <br /> minutes late, the Contractor shall be deemed to have failed to respond to <br /> the request and a total of five hundred dollars ($500) in liquidated damages <br /> will be assessed for a failed response. <br /> 3.1.1.5 <br /> 3.1.1.6 11.4.3 For each Modified Operations "Non-Code" request that <br /> exceeds 19:59 minutes the Contractor shall be assessed liquidated <br /> damages at a rate of fifty dollars ($50) per minute or fraction thereof for <br /> each minute up to five minutes. For any response greater than 5 minutes <br /> late, the Contractor shall be deemed to have failed to respond to the <br /> request and a total of five hundred dollars ($500) in liquidated damages will <br /> be assessed for a failed response. <br /> 3.1.1.7 11.4.4 For each Modified Operation "Code" request that <br /> exceeds 14:59 minutes, the Contractor shall be assessed liquidated <br /> damages at a rate of fifty dollars ($50) per minute or fraction thereof for <br /> each minute up to five minutes. For any response greater than 5 minutes <br /> late, the Contractor shall be deemed to have failed to respond to the <br /> request and a total of five hundred dollars ($500) in liquidated damages will <br /> be assessed for a failed response. <br /> 11.4.5 Liquidated Damages for Dropping Below 125% of Peak Coverage: For any <br /> day that the Contractor fails to have adequate vehicle inventory to cover 125% of <br /> peak coverage,the Contractor shall be assessed liquidated damages at a rate of five <br /> thousand dollars ($5,000) per day. <br /> 11.4.6 Liquidated Damages for Failure to Properly Equip/Staff Unit: Any deployed <br /> unit failing to meet the minimum required equipment, supplies and staffing shall be <br /> assessed liquidated damages as a missed call at a rate of$600. Such units must be <br /> immediately removed from service until the deficiency is corrected. <br /> 17 of 34 <br /> 17 <br />