Laserfiche WebLink
SMR <br /> .RCHITEC I :; <br /> 6 October 2014 <br /> City of Everett <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> Attn: Steve Miller <br /> Re: Bakerview - Plan Check# B1409-017 <br /> Below is the response to correction letter dated September 16th, 2014. <br /> #1: The proposed canopy is required to be of non-combustible construction. <br /> - wood car-decking has been replaced with metal pan-decking with a <br /> wood soffit board attached underneath. This revision can be found <br /> drawings: <br /> A5.00 Elevations & Sections: Entry Canopy& Benches; <br /> S3.10 Enlarged Plans: Lobby, Foundation &Canopy Framing Plans; <br /> 54.01 Sections & Details <br /> #2: Complete the RCW 64.55 multi-family certification worksheet <br /> - owner to provide. <br /> Ma 1.NMdwh <br /> Thanks, <br /> Douglas J.Ito <br /> Dam babas andrew phillips <br /> souDStarr architect <br /> aphillips@smrarchiteds.com <br /> 206.316.2682 direct <br /> >1MD__ _ • <br /> Mt1116MwAi■lalios <br /> Seattle,WA 98104 <br /> �Mw <br /> IklM SIM <br /> MUM= <br /> Mir - �e - <br />