Laserfiche WebLink
19. kmat ,?/5V <br /> WALSH ,E1-/A <br /> Construction G � .0s— l5* ,P` <br /> C.00411 <br /> rwlt , <br /> REQUEST FOR INFORMATION -# BV-048 <br /> To: Clair Ervin From: Marlah Grife <br /> McCullough Allen Walsh Construction COJWA <br /> 2605 15th St 509 Fairview Ave. North <br /> Everett, WA 98201 Seattle, WA 98109 <br /> Project: Bakerview Ref: <br /> 2005 MI St <br /> Everett.WA 99201 <br /> Phone 0108)647-4005 <br /> Fax: <br /> Issue Date: 1.27/16 <br /> Response Required By:2/2/15 <br /> Cost Impact: Yes <br /> Schedule Impact: No <br /> Activity Reference: Work Location: <br /> Drawing / Detail: Specification Section: <br /> Responsible Party: <br /> Subject: Backsplash Panels at Unit Ranges <br /> Question: <br /> WCC has confirmed with Sears Appliances that a Stainless Steel sidesplash would be required at cabinets adjacent to ranges in all units in order to <br /> meet manufacturers requirements-reference page 2 of this RFI for these requirements. <br /> Supply and install of 24"high panels at the rear and side of each range would be a change cost ROM of about$14,000. <br /> WCC and RDF would need access into completed units for this work. <br /> Please confirm addition of 24"SS back and sidesplash panels at each unit range per sketch provided on page 4 of this RFI. <br /> Answer: <br /> Confirmed <br /> Answered By. andrew phillips/SMR 11 FEB 2015 <br /> 01/ <br />