Laserfiche WebLink
Stormwater from the proposed project is designed to mimic natural drainage patterns in the <br />basin and, as a result, will maintain the baseline condition for this parameter. <br />Road Density & Location <br />The only road crossing over Edgewater Creek is a tall bridge for W. Mukilteo Boulevard. The <br />bridge is not believed to have any significant impact on the stream given its disconnectedness due <br />to height. The BNSF railroad crossing at the northern terminus of Edgewater Creek is the only <br />other disruption in this category, with the majority of Edgewater creek being buffered from roads <br />by the forested ravine. Therefore, the baseline conditions are properly functioning for the <br />Edgewater Creek action area. <br />This project will not change road density or location and, as a result, will maintain the baseline <br />condition for this parameter. <br />Disturbance History <br />Edgewater creek, like the other creeks emptying north into Possession Sound, has a high level of <br />historical disturbance related to the railway and timber industry. Additionally, road runoff from <br />residential development designed before modern stormwater conveyance requirements has <br />destabilized portions of the sloped forested ravine associated with the stream. Baseline conditions <br />for this element are at risk for the Edgewater Creek action area. <br />Although the project will involve approximately 33 acres of clearing and grading within the <br />action area, this change will not have a significant impact on the level of disturbance within the <br />watershed. This is mainly due to the existing high level of disturbance resultant from surrounding <br />developed areas and relatively recent clearcutting of the subject property. As a result, this <br />proposed project will maintain the baseline condition for this parameter. <br />Riparian Reserves <br />Within the Edgewater Creek drainage basin, riparian vegetation is dense and relatively <br />undisturbed by recent activity. Riparian buffers are relatively wide compared to other nearby, <br />urban stream channels. Based on these findings, riparian reserves are properly functioning in <br />the Edgewater Creek action area. <br />No riparian vegetation will be disturbed by this project, so it will maintain the baseline <br />condition for this parameter. <br />4.4 PROJECT DESCRIPTION <br />The applicant is proposing four industrial manufacturing buildings with associated parking and <br />utilities on the subject property. With the exception of the steep slope area in the southwest <br />portion, the site will be cleared and mass graded, cutting the higher, southern portion and filling <br />the lower, northern portion to create a relatively level development site. Once clearing and <br />grading is complete, underground utilities will be installed and then construction of the buildings <br />and drive aisles will begin. Building construction will occur in two phases and is expected to <br />occur over a two year period. <br />Biological Evaluation 17 WRI #14109 <br />Soundview Business Campus Revision #2: October 2, 2015 <br />