Laserfiche WebLink
i <br />i <br />PRE -BASIN B <br />524,739 SF <br />12.05 AC ' <br />PRE -BASIN C ) <br />340,863 SF <br />7.83 AC <br />I <br />PRE -BASIN A w, <br />281,159 SF r <br />6.45 AC PRE -BASIN D <br />' 94,605 SF d <br />2.17 AC <br />PRE -BASIN A PRE -BASIN C <br />RUN—ON RUN—ON :x <br />55,152 SF <br />1.27 AC 102,175 SF <br />2.35 AC <br />Figure 3: Drainage basins on the proposed development site for Soundview Business Center. <br />Under developed conditions, stormwater from impervious surfaces on the site will be directed to <br />on -site stormwater vaults located on the western and northern edges of the developed areas. <br />Stormwater will be treated for water quality prior to detention via underground vaults. Clean <br />stormwater will exit the site through a controlled release system. Stormwater will be released to <br />the west, north, and northeast (Pre -Basins A, B, and, C respectively) in proportions that will <br />mimic the current drainage regimes within the site. Drainage released to Pre -Basin A will be <br />Biological Evaluation 19 WRI #14109 <br />Soundview Business Campus Revision #2: October 2, 2015 <br />