Laserfiche WebLink
PRE —BASIN E <br />524,139 SF <br />12. AC <br />PRE —BASIN A <br />281,159 SF <br />6.45 AC <br />PRE —BASIN A <br />RUN—ON <br />55,152 SF <br />1.27 AC <br />Figure 3: Drainage basins on the proposed development site. <br />PRE —BASIN C <br />340,863 SF <br />7.83 AC <br />PRE —BASIN ? <br />94,605 SF <br />2.17 Au <br />PRE —BASIN C <br />RUN—ON <br />102,175 SF <br />2.35 AC <br />Soundview Business Campus 4 WRI #15202 <br />Compensatory Wetland Mitigation Plan Revision #2: October 2, 2015 <br />