Laserfiche WebLink
2.O DESCRIPTION OF THE DEVELOPMENT SITE BASELINE CONDITIONS) <br />The site is undeveloped and located in an area of existing commercial and residential <br />development. Mature forest is present on the steep slope located in the southwest corner of the <br />property as well as in the southeastern corner of the site, which contains a wetland mosaic <br />comprised of three wetlands. The remainder of the site, which makes up the majority, was clear- <br />cut in 2006 and is currently vegetated by scrub -shrub communities due to the resultant <br />succession. With the exception of the southwestern portion of the site, the subject property <br />displays a general northern aspect. Surrounding land use is comprised of a commercial <br />development to the east (Intermec Corp.), residential development to the north and northeast, <br />and forested areas to the west and south. The Boeing railroad spur lies just west of the site. <br />Current zoning of the site is M-1 Office and Industrial Park. <br />The study area contains two Category II wetlands (Wetlands A and C) and two Category III <br />wetlands (Wetland B and D) (Washington Department of Ecology (DOE) and City of Everett <br />classifications). Photographs and wetland rating forms are included in the Critical Area Study, <br />Appendix C of the Biological Evaluation. Edgewater Creek and Japanese Gulch Creek both <br />receive drainage from the project site, and are both within a half -mile of the site. <br />There are currently four drainage areas existing onsite, as shown in Figure 3. The western -most <br />portion of the site to be developed (Pre -Basin A) drains down the steep slope along the western <br />border and in the southwestern corner of the site, and subsequently into Japanese Gulch. The <br />northwestern drainage area (Pre -Basin B) drains north into an intersecting ravine, which leads <br />into a series of several existing stormwater conveyance features that eventually discharge into the <br />ravine above Edgewater Creek. The northeastern drainage area (Pre -Basin C) drains to the <br />northeast into a ravine that shallows out and is intersected by a drainage ditch leading into <br />Edgewater Creek. The southeastern drainage area (Pre -Basin D) contains Wetlands A-C, and is <br />hydrologically sourced from the off -site area to the south (Pre -Basin C Run -On). Runoff <br />currently outlets from Wetland A into a catch basin, under 36th Avenue W, flowing to an existing <br />stormwater conveyance ditch on the neighboring property. <br />Soundview Business Campus 3 WRI #15202 <br />Compensatory Wetland Mitigation Plan Revision #2: October 2, 2015 <br />