Laserfiche WebLink
Sabrina Fandler <br /> From: Charles Johnstone <br /> Sent: Thursday, November 05, 2015 4:22 PM <br /> To: Sabrina Fandler <br /> Cc: Jeff Kerwin <br /> Subject: SEPA reviews et al <br /> Follow Up Flag: Follow up <br /> Flag Status: Flagged <br /> Good Afternoon, <br /> No IPT issues with the fleet parking lot for Pioneer Cable (SEPA# 15-036). <br /> Also No issues with PUD's battery storage project at the Everett Substation (SPU 15-04). A minor item I did notice in <br /> their BESS equipment section (page 3 of 24).The battery container bullet notes four "strings" of four containers each. <br /> The next bullet notes one Power Conversion System (PCS) for each string but says there's a total of five PCS units.. <br /> (should it be four?). <br /> RE binding site plan (BSP 15-003)for Soundview Business Campus at 5900 36th Ave W., IPT has no initial concerns about <br /> the proposed (shell) building construction. <br /> But there may be issues to address with future tenants that may occupy the space(s);this depends on the nature of <br /> whatever'manufacturing' business(es)go in there. So for example, if they put any floor drains in the building, certain <br /> manufacturing uses going in could require plugging or eliminating such drains, or adding under slab piping for drainage <br /> from any manufacturing or production that entails some kind of wet process with discharges requiring some type of <br /> pretreatment. So we'd of course address that with future tenant applicants. <br /> Thanks. <br /> C <br /> X8224 <br /> 1 <br />