Laserfiche WebLink
Sabrina Fandler <br /> From: Jane Zimmerman <br /> Sent: Tuesday, November 17, 2015 7:21 AM <br /> To: Sabrina Fandler <br /> Subject: BSP#15-003, 5900 36th Ave W <br /> Hi Sabrina— <br /> Stormwater from this project shall be managed in accordance with the City of Everett's 2010 Stormwater Management <br /> Manual. The most current version of WWHM2012 shall be used for stormwater modeling and design, including a 15- <br /> minute time interval. <br /> Construction Stormwater Pollution Prevention will be required for this project in compliance with City standards. In <br /> addition, because the project will disturb more than an acre of land,the applicant must apply for coverage under the <br /> Washington State Department of Ecology's Construction Stormwater General Permit. <br /> Thank you, <br /> Jane <br />